Type something and hit enter

ads here
On
advertise here

An unexpected shower repair came up and it was necessary to have the shower stripped down to the studs, make the plumbing repair and now rebuild.Getting a bit of conflicting information..now after the fact.East wall faces a laundry room South wall is a block exterior wall with 3/4" insulation board and 1-by's on top of that.West wall is a 1/2 wall with treated 2x4's.Using densshield 1/2" 4x8 sheets as the tile backer.Regard was applied to the entire 1/2 wall -- studs and back of the purpleboard. Purpleboard is outside of the shower on the opposite side of the wall.Regard was also applied to the south wall insulation board face and 1-by's about 6' up the wall from the shower panThere is no plastic/vapor barrier between the 3/4" insulation board and the block wall. It is essentially Block, insulation board, 1-by's.I cannot seem to find a straight answer if it is ok to apply redgard to the insulation board and 1-by's, then cover with denshield.The 1/2 wall I don't think is going to be an issue but the studs in that are covered with RG as well.Does this need to be re-done? via /r/DIY https://ift.tt/3mBuozu

Click to comment