Type something and hit enter

ads here
On
advertise here

I have a pre-existing concrete floor in my basement, problem is at the deepest it slopes to 2 inches. The basement is finished and has been for the last 30+ years with now water issues. There is no drain the floor comes to rest that low towards the center with cracking that needs to be filled.To get this level I assume I will have to use concrete to build the floor up to level. Question is how to prep the floor below for bonding? Also is this the best way of leveling it out?Thanks via /r/DIY http://ift.tt/2EUiJG2

Click to comment