Type something and hit enter

ads here
On
advertise here

Hello again - looking for advice on how much floor prep I need to do to install hardwoods. Most of the space is straight particle board subfloor, but where we took tile out, the felt paper isn’t coming up easily.How much work should I do to create a totally level surface?Also, I’m putting new substrate down where the footer of an old wall was (pics 2 & 3), so there will be a little gap between the old and new subfloor. I was thinking of filling it with some self leveling compound - is that a bad idea?Here’s the Imgur albumAs usual, thanks for the help Reddit! via /r/DIY http://ift.tt/2zIy4eZ

Click to comment