Over the November holiday break my wife and I skipped the Thanksgiving trip that we usually go on to remodel our 5x8 bathroom. The bathroom was dated to say the least. Also, the previous owner themed it in shades of pink. My wife and I worked for 10 hours each day gutting, reframing, drywalling, installing new plumbing, and new fixtures. We did everything ourselves except the tiling which was $400 and completed by my cousin. Everything except the ceiling drywall was replaced. From gut to functioning took 8 days. The tiling was another three days. Overall the job took 11 long days. We only have one bathroom so we had a strong incentive to work quickly.All of the photos: https://ift.tt/2GXgvtH the finished project: Finished bathroom https://ift.tt/2tyxVVW via /r/DIY https://ift.tt/2BLlCtS