
It's really loud when the AC is running and greatly fucks up the whole theater situation. On the other side of the HVAC room there's a wall under the stairway with a cut out for the air intake tube to run to a vent in the same room that the door opens to.Could I simply cut some slits in that drywall and cut more on the other side of this storage area so that it's opened to the unfinished area of the basement? Or is it absolutely necessary that the door be slatted?Don't have pics but can take some tonight via /r/DIY https://ift.tt/2HPuNtb