Type something and hit enter

ads here
On
advertise here

http://ift.tt/2tyyKvV joist is nailed into the beam, and is resting on the ledger strip, but as things have shifted over the decades, there's only about 1/4" left bearing on the strip.Ideally, I'd like to add a joist hanger, but are there options to work around the strip?I know I'll need to relocate the furnace wiring, and I'm ok with that.If there is a better subreddit for this question, please let me know. via /r/DIY http://ift.tt/2rqTBjW

Click to comment