Type something and hit enter

ads here
On
advertise here

So I am looking into adding a bathroom into my basement (sink, shower, and toilet) but the main drainage line is above the basement floor (3.5 feet) So my original thought was to just have all of the pipes run to a large sewage ejector pump that just pumps everything into the drainage line.My questions are 1, Are Sewage Ejection Pumps designed to handle large waterflow like you would get from a shower or sink vs the intermittent toilet flushing. 2, Would it be better to have a sewage ejection pump AND a sump pump. The toiler would go to the ejection / grinder and the others would just go to a sump pump.Any thoughts or tips would be awesome! via /r/DIY http://ift.tt/2o3xyQW

Click to comment