
Finally going to put up some drywall in my garage. The two side walls and the wall with the overhead door have cement that goes up about six inches from the ground with the framing built on top of that. So my question is should I only drywall over the frame or should the drywall cover just up above the floor?One more question, do I need to tape and mud all the seams right away? I only ask because I was contemplating having someone come in and do that work. via /r/DIY https://ift.tt/2Dqo6AT