
The insulation behind the vapour barrier, against concrete wall is wet. It's in an unfinished crawl space under bi-level stairs. Section is maybe 4ft x 3ft high.Here is a pic of the problem after I cut the plastic off the section and I pulled out the insulation. https://ift.tt/2MMjDIK now drying the area shown. It's been 34C / 94F degrees for the last week or so. So I think that contributed to the condensation.What do I do now to put it back together? Should I just insulate with fiberglass the same as it was and plastic over it again? Or is there a better method for this location to prevent a recurrence? via /r/DIY https://ift.tt/2u7snS3